Minutes of the 3rd meeting of State Level
Sanctioning Committee under UIDSSMT held on 14.08.2007
at Shimla, Himachal Pradesh.
Meeting of State Level Sanctioning Committee held on
14.08.2007 at 10.30 AM in the Committee room, Armsdale
building HP Secretariat, Shimla and was attended by
the following:
1. Shri Deepak Shanan,
In Chair
Principal Secretary(UD),
Govt. of HP, Shimla.
2. Shri Sanjeev
Bhatgnagar,
Joint.Secretary(UD),
Govt. of H.P.
3. Sh.J.S.Rana,
Director,
Urban Development.Shimla-2
4. Shri B.L.Raghav,
Joint Director,
Urban Development.Shimla-2
5. Shri K.K.Joadder,
Deputy Chief Architect, Town and Country Planning
Office,
Ministry of Urban Development, New Delhi.
6. Shri Hoshiar Chand,
Dy. Secretary (PWD),
H.P, Shimla-2.
7. Shri S.K. Sharma,
CEO-cum-Secretary,
HIMUDA, Shimla-2.
8. Mrs. Purnima Chouhan,
Joint.Secretary(IPH),
Govt. of H.P.
9 Shri R.N. Sharma,
Engineer in Chief,
IPH, Shimla-1.
10.
Sh.Surinder Vashisht,
Executive Engineer (N)
HIMUDA-Shimla.
11.
Sh.S.K.Angra,
Project Officer(UD),
Shimla-2.
CEO-cum-Secretary, HIMUDA welcomed the Chairman and all the participants
and requested that Agenda items be pursued for
decisions which were discussed as under:-
1.
Providing Water Supply Scheme to Surrounding
area of Chamba Town.HP.
(Rs. 60.23 Lakhs)
The project is proposed to provide water
supply to the surrounding left out area of Oberi,
Mai-Ka-Bag and Sultanpur in Chamba Town. The DPR was
prepared by I&PH Department for an estimated cost Rs.
60.23 Lakhs. The project envisages augmenting the
water supply in the area from the 94,000 lts/day to
5.68 lakhs lts/day for the projected population of
4597 persons, offices, hospitals, student hostel and
790 urban poor in two zones. During the discussion it
was observed that the projected demand is based on 125
lts/day/capita (lpcd) rate of supply as against the
CPHEEO norm of 135 lpcd for the towns having sewerage
system. In fact the Chamba town already has sewerage
system and also proposed to augment the capacity under
UIDSSMT. The Chairman desired that a comprehensive
water supply project should be prepared for the whole
town for 24 hrs water supply @ 135 lpcd while
integrating the existing water supply system. The
requirement of water for fire fighting should also be
considered while projecting the demand. Town & Country
Planner, TCPO informed that all norms, standards and
guidelines for preparation of DPR for water supply
project as per CPHEEO Manual are in the Ministry of
Urban Development Web Site (www.urbanindia.nic.in)
which may be referred before preparing the proposal.
The approval of the project has therefore been
deferred and it was decided that the I&PH Department
will prepare a fresh DPR considering the above
observations and submit to SLNA (HIMUDA) for appraisal
before the project is placed in the SLSC meeting for
consideration.
2. Providing Sewerage Scheme to left out area of Chamba Town
(Rs. 432.185 lakhs)
The DPR was prepared by I&PH Department and envisages
to provide sewerage system for the localities of
Hardaspura (Upper & Lower), Ladi, Mugla, Thukrer,
Minda, Adarshnagar, Jukhrari and Kuian in the
surrounding areas of Chamba town. The area falls
outside the existing Sewerage System of the town.
Presently waste water and sewage is disposed off into
the drains through septic tanks having serious
environmental and health hazards. The project proposes
to provide 13.7 km of sewer line having about 478
inspection chambers and five treatment plants with a
total capacity of 1.599 MLD designed for 30 years with
three years of construction period serving population
of 3830 persons. The proposed area has been divided
into five zones having separate treatment plants. It
is proposed in the DPR that O&M cost will be met with
the monthly billing @ 50 % of the monthly water
billing.
The project was approved for Rs.432.185
lacs and the SLSC also approved 1.5% of the approved
cost for preparation of DPR
3. Any other item
The Chairman desired that preparation of DPRs of
other towns may be expedited by the respective
department/agencies and placed in the next SLSC
meeting and Power point Presentation should be
prepared for each project covering the salient
features justifying all components of DPR for the SLSC.
The Town & Country Planner, TCPO, Government of India
requested that appraisal report along with summary of
the DPR and technical appraisal may be sent to TCPO/MoUD
well in advance so that appropriate suggestions /
comments / observations may be sent to HIMUDA before
the SLSC meeting. He also informed that total central
allocation during the current financial year is
Rs.1.92 crores and allocation for the entire mission
period (2005-2012) is Rs.17.44 crores under UIDSSMT
for the State of Himachal Pradesh. Till date Rs.7.49
crores have been released for 7 projects in 3 towns.
Meeting ended with a vote of thanks to the Chair.